Kollsnes gas processing plant
As technical service provider (TSP), StatoilHydro is responsible for the operation, maintenance and further development of the Kollsnes gas processing plant on behalf of the operator Gassco.
The plant was initially built to receive gas landed from the Troll field through two 36-inch pipelines.
The plant currently has a design capacity of 147 mmcm per day. In 2008, an upgrade of the flash gas compressor and the condensate system was successfully completed to increase the robustness of the plant.
In 2008, Kollsnes produced 33.8 bcm of dry gas and 82.8 mmcm of condensate.

At Kollsnes gas comes ashore for further processing before it is transported in pipelines to customers in Europe.