Tyrihans 

Tyrihans consists of five subsea templates, four of which are responsible for production and gas injection, and one for raw seawater injection.

Pumps will suck in 14,000 cubic metres of untreated seawater each day, and inject this into the reservoir. The pumps drive the water into the ground between Tyrihans North and South. When this is combined with gas injection optimal pressure support is obtained in the reservoir.

The well stream from the subsea templates will be transferred to the Kristin platform through a 43-kilometre pipeline. The long distance makes great demands on the pipeline quality and design. Tyrihans has the world's longest pipeline with direct electrical heating.

The technology developed in connection with Tyrihans sets a new standard for subsea field development. Stringent environmental and maintenance-related requirements must be met by the equipment. The structures are designed to last without maintenance throughout the 25-year production period. Tyrihans is scheduled to come on stream in 2009.

You do not have Flash installed Download Flash player.

Download Flash player

Pumper skal suger inn 14.000 kubikkmeter ubehandlet sjøvann hver dag, og injisere dette i reservoaret. Pumpene trykker vannet ned i bakken mellom Tyrihans Nord og Sør. Når dette kombineres med gassinjeksjon, oppnås optimal trykkstøtte i reservoaret.

Brønnstrømmen fra havbunnsrammene skal overføres til Kristin-plattformen gjennom en 43 kilometer lang rørledning. Avstanden stiller store krav til kvalitet og design på rørene. Tyrihans har verdens lengste rørledning med direkte elektrisk oppvarming.

Teknologien som er utviklet i forbindelse med Tyrihans, setter en ny standard for utvikling av havbunnsfelt. Det er stilt strenge krav til utstyr både med tanke på miljø og vedlikehold. Strukturene skal holde uten vedlikehold hele produksjonsperioden som er satt til 25 år. Planlagt oppstart for Tyrihans er i 2009.