The thermal power plant at Mongstad will have energy needs equivalent to about 700 million standard cubic meters of gas annually at full operation.

Of this, it is expected that as much as 500 million cubic meters will be imported as natural gas through the new pipeline from Kollsnes, while the remainder will be supplied by the refinery itself.

 Gas pipeline Kollsnes - Mongstad
Length: Approx 65 kilometres
Diameter: Basic 12"
Design pressure: 200 bar gauge
Route: Mainly along the West process pipeline (4 kilometres on land and 61 kilometres at sea)